Bathrooms · Kitchens · Costa del Sol

Bathrooms and kitchens, rebuilt properly

Most bathroom problems in Spanish homes sit behind the tiles: old waste pipes, no waterproofing, a shower tray on a raised plinth. We strip back to the structure, renew what is hidden and then build the room you actually want to use.

  • One contractor from strip-out to silicone
  • Quote itemised line by line
  • We buy the materials
  • Site left clean
  • Guarantee and liability insurance
Shower with niche and black ceiling rain headIntegrated basin with brass-finish tapKitchen with blue units, concrete-effect column and pendant lamp
The part you never see decides how long it lasts.

A bathroom can look perfect on handover day and leak into the flat below a year later. The waterproofing, the fall towards the drain and the way the pipes are joined are where we spend our attention, because tiles and taps are easy to replace and a soaked floor slab is not.

How a job runs

From your photos to the first shower

Bathrooms and kitchens are small rooms with many trades packed into them. Eight stages keep each one in its place and stop finished work being broken open again.

  1. Photos and measurements

    You send photos of the room, the ceiling, the existing pipes if visible and an approximate floor area. We reply with a first assessment.

  2. Visit and itemised quote

    We check falls, wall condition and access, then list every task with its unit and quantity.

  3. Layout and finishes

    Shower position, basin, WC, niche, lighting and finishes are agreed on paper before anything is ordered.

  4. Strip-out

    Old tiles, sanitaryware and screed come out; debris leaves the building in a way agreed with the community.

  5. Pipes and electrics

    Supply and waste are renewed; electrics are handled by authorised partner installers under our coordination.

  6. Base and waterproofing

    Walls and floor are levelled, falls are formed and the waterproof layer goes on before any finish.

  7. Tiling or seamless finish

    Tiles or the jointless coating go on, followed by niches, edges and grout or sealing.

  8. Fit, test and clean

    Sanitaryware, taps, screen and lights are fitted, everything is tested for leaks and the room is cleaned for handover.

Attic bathroom with bath and blue tiled front

Bath or shower?

Keep the bath or switch to a shower? It depends on you

Removing the bath is the most requested change we see, but it is not right for every household. Who uses the room, how often it is let, and whether it is the only bath in the property all matter.

A shower usually makes more sense if…

  • the bath is mostly used for showering anyway
  • stepping over the bath edge is becoming awkward
  • the room is small and needs to feel larger
  • the property is a holiday let with short stays

Keeping a bath can be wiser if…

  • young children live in the property
  • it is the only bathroom in the home
  • you genuinely enjoy a soak
  • buyers in your segment expect at least one bath

Our work

Bathrooms and kitchens as delivered

Photos from our own jobs: level-access showers with linear drains, niches with ceiling rain heads, seamless counters with wall-mounted taps, and kitchens finished after the services were renewed.

Shower with niche and black ceiling rain head
Niche and ceiling rain shower
Integrated basin with brass-finish tap
Integrated basin, brass tap
Bathroom with grey seamless finish and black designer towel rail
Seamless finish and designer towel rail
Double basin in seamless countertop with black wall taps
Built-in double basin
Kitchen with blue units, concrete-effect column and pendant lamp
Kitchen with concrete-effect column
Bathroom with blue textured wall tiles and light floor
Blue textured wall tiling
In short

We renovate bathrooms, en-suites, cloakrooms and kitchens on the Costa del Sol as a single contractor. We remove the old room, renew pipes and waste, waterproof, tile or apply a seamless finish, fit everything and clean up. Electrics are carried out by authorised partner installers under our coordination. The quote is itemised and free, and photos plus an approximate floor area are enough to start.

Why does a bathroom renovation start behind the tiles?

In many Spanish apartments the original bathroom was tiled directly over the brick, with galvanised or copper supply pipes and narrow waste pipes buried in the floor screed. Nothing was waterproofed in the way a modern shower needs. When owners replace only the visible parts, the old pipe joints and the missing membrane stay exactly where they were.

That is why our bathroom jobs normally begin with a full strip-out to the structure. Once the walls and floor are open we can see what condition the pipes are in, where the waste runs and how much height there is for a shower fall. Our bathroom renovation page walks through the full scope, and the waterproofing guide explains the layers that go back in.

Can the bath be replaced by a shower in any bathroom?

In most cases, yes, but the result depends on what is underneath. A floor-level shower needs enough depth for the waste pipe to fall towards the soil stack. In a ground-floor villa that is rarely a problem; in an apartment block with a concrete slab, the waste may have to run in the old screed depth or the shower floor may need to sit slightly higher than the rest of the room.

We check this during the visit rather than promising a flush threshold from a photo. If a completely flat floor is not possible, a low-profile tray or a single small step can still give a clean, safe result. See bath-to-shower conversions and the step-by-step conversion guide.

What actually keeps water out of the floor below?

Not the tiles and not the grout. Both let moisture through over time. What protects the structure is a continuous waterproof layer applied to the prepared walls and floor of the wet zone, turned up at the corners, sealed around the drain and around every pipe that passes through it. Tiles or a seamless finish are then bonded on top.

In an apartment the neighbour below is the first to notice when this layer is missing or broken. We build it as a separate stage, keep it visible until it has been checked, and only then let the tiler start. The order matters more than the brand of any product.

Tiles or a seamless finish: what is the real difference?

Tiles are modular, tolerant of small movements in the building and easy to repair one piece at a time. A seamless coating gives a continuous surface without grout lines, which many owners like for walk-in showers and basin counters. It also asks more of the base: cracks or movement underneath tend to show through.

Neither is automatically better. We explain the trade-offs on the tiling and seamless bathroom pages, and in the article seamless finish or tiles. For textured gotelé walls elsewhere in the property, our sister site quitargotelemalaga.eu covers wall smoothing and painting.

How do you make a small bathroom work better?

Many coastal apartments have an en-suite squeezed between bedrooms and a guest WC under the stairs. The fixes are rarely about decoration. A wall-hung WC frees floor space and makes cleaning easier; a shower that runs the full width of the room avoids a cramped corner tray; a door that opens outwards or slides gives back the space inside.

Niches built into a stud wall replace shelves that collect water, and a single large mirror with indirect light makes the room read larger. The small bathroom page and the layout guide go into the options.

What should happen before new kitchen units arrive?

A kitchen is mostly services: water supply, waste, a dedicated circuit for the oven and hob, sockets at worktop height and a route for the extractor. Once the units and the worktop are in, every one of these is hidden and expensive to move. So the plumbing and electrical positions are fixed first, the walls and floor are finished behind where the units will stand, and only then does the furniture go in.

Opening the kitchen to the living area adds another layer: whether the wall can come down at all, where the extractor will exhaust and how smells and noise travel. See kitchen renovation, open-plan kitchens and the kitchen sequence guide.

Who does the electrical work in a bathroom?

Bathrooms are treated as a special location in Spain’s low-voltage electrical regulations, with zones around the bath or shower where sockets, switches and light fittings are restricted. That work is carried out by authorised partner installers who work under our coordination, not by our own tilers or plumbers.

For you nothing changes in practice: you still have one point of contact and one schedule. What it means on site is that light positions, extractor fan, heated towel rail and mirror lighting are agreed early so the cables are in place before the waterproofing and finishes go on.

Do I need permission from the community to redo my bathroom?

Inside your own apartment you can normally change the bathroom and kitchen, but anything that touches the building’s shared elements is different. The main soil stack, the structure and the façade belong to the community. Spain’s Horizontal Property Act also expects owners to notify the community’s representative before carrying out works in their unit.

The town hall side depends on the scope and the municipality: in Andalusia many interior works are covered by a declaración responsable, a sworn notice filed with the ayuntamiento, rather than a full licence. We tell you which parts of your job may need this, but the filing itself is yours or your administrator’s (municipal requirements: to be verified for each town).

Sources: Ley 49/1960 de Propiedad Horizontal, art. 7.1; Ley 7/2021 (LISTA).

What makes one bathroom quote higher than another?

We do not publish prices, because two bathrooms with the same floor area can need very different work. The usual drivers are how much has to be stripped out, whether the waste has to move, the condition of the walls, the type of shower floor, the size and format of the tiles or the choice of a seamless finish, the sanitaryware and taps, and how easy it is to get materials up and debris out.

Our article on what makes a bathroom cost more explains each factor. For how renovation costs are built up in general, see presupuestoreforma.eu.

What do we not do?

We renovate existing bathrooms and kitchens. We do not prepare architect’s projects, energy certificates or licence applications, and we do not build pools, new houses or air-conditioning systems. If the original pipes or a cistern turn out to be asbestos cement, removal must be done by a registered specialist; our partner site retiradauralitamalaga.eu deals with that.

If the bathroom is part of a wider job across the whole property, the full renovation site explains how we coordinate everything else.

Where we work

Along the Costa del Sol

We are based in Marbella and renovate bathrooms and kitchens from Manilva to Málaga city and along the coast to the east. Apartments in town, gated developments with an owners’ community and detached villas each bring their own logistics; tell us where the property is and we plan around it.

  • Marbella
  • Mijas
  • Estepona
  • San Pedro Alcántara
  • Nueva Andalucía
  • Benahavís
  • Manilva
  • Fuengirola
  • Benalmádena
  • Torremolinos
  • Málaga
  • Rincón de la Victoria

Areas →

FAQ

What owners ask before a bathroom renovation

Can you quote for a bathroom from photos?

Yes, for a first assessment. Send a wide photo of each wall, the floor, the ceiling and the existing shower or bath, plus the approximate floor area. The final itemised quote follows a visit.

Is the quote free?

Yes. The assessment, the visit and the itemised quote are free and carry no obligation.

Do you remove the old bathroom yourselves?

Yes. Strip-out and debris removal are part of the job and appear as their own lines in the quote.

Can I have a shower with no step at all?

Often, but not always. It depends on the depth available for the waste and the fall. We confirm it on site before you commit to a design.

Will the new bathroom be waterproofed?

Yes. A continuous waterproof layer goes on the floor and walls of the wet zone before any tiles or seamless finish.

Do you do the electrics?

Electrical work is carried out by authorised partner installers coordinated by us, so you still deal with a single contact.

Can you buy the sanitaryware and tiles?

Yes, we handle materials purchasing. If you prefer to supply some items yourself, we adjust the quote.

Do you do kitchens as well as bathrooms?

Yes. We renovate kitchens including pipework, waste, wall and floor finishes and fitting the units you choose.

Can you open my kitchen to the living room?

In many apartments, yes, if the wall is not structural. If there is any doubt we ask you to have it checked by an architect or building surveyor first.

Do I need a permit for a bathroom renovation?

It depends on the scope and the town hall. Many interior jobs in Andalusia only need a declaración responsable. We explain what usually applies; the filing is not part of our service.

Do I have to tell the community?

You should notify the community’s representative before works in your unit, and any change to shared pipes or the façade needs the community’s agreement.

Can the bathroom be done while I am not in Spain?

We can give a first assessment from photos and the approximate floor area by email or WhatsApp. Access to the property during the works needs to be arranged with you.

Can I use the rest of the flat during the works?

Usually yes, if there is a second WC or you can manage without the room. We seal off the work area and clean as we go.

Is a seamless finish suitable for a shower?

It can be, provided the base is stable and waterproofed and the system chosen is meant for wet areas. We explain the limits before you decide.

Can you fix a leak into the flat below?

If the cause is in the bathroom, a renovation that renews pipes and waterproofing removes it. We first locate where the water is coming from.

Can you deal with mould in the bathroom?

We remove affected finishes and improve extraction where possible. If damp comes from the structure or the roof, that needs a separate diagnosis.

Do you give a guarantee?

Yes. Our work carries a guarantee and we hold public liability insurance. The guarantee terms are written into the quote.

How long does a bathroom take?

It depends on the scope, the finishes and material lead times. Your quote includes the order of stages for your specific job.

Do you remove asbestos pipes?

No. If asbestos cement turns up, a registered specialist must remove it; we point you to our partner site for that.

How do I start?

Send photos and the approximate floor area through the form, on WhatsApp or by calling +34 613 656 443.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?