Bath to shower, step by step

If you are replacing a bath with a shower in Spain, it helps to know what each stage involves, what you need to decide and when. This guide follows the job from survey to the first shower.

Author / technical lead: Bauman Raymond Attila · Last reviewed: 05/11/2026

Shower with light seamless finish and indirect lighting
In short

A bath-to-shower conversion runs through a survey, design decisions, any notice to the town hall and the community, strip-out, new supply and waste, forming the shower floor, waterproofing, tiling or a seamless finish, and fitting the shower set and screen. The single most important check is the depth available for the waste, because it decides whether the shower can be flush with the floor. Electrical changes near the shower follow specific rules and are handled by authorised partner installers.

What is checked during the survey (step 1)?

We look at the bath and the wall behind it, the floor construction, where the waste currently runs and how it reaches the soil stack, the position of the window and door, and the electrical points in the room. We measure the depth available below floor level for a shower trap and the fall of the waste.

We also ask about use: who will shower there, whether anyone has limited mobility, whether the property is let. These answers change the recommendation as much as the measurements do.

Step 2: which decisions do you need to make before work starts?

  • Floor-level or low tray. Based on the survey, we explain whether a flush floor is feasible.
  • Drain type and position. Linear along a wall or a point drain.
  • Screen. Fixed panel, sliding or hinged door.
  • Shower set. Concealed or exposed mixer, rain head, hand shower.
  • Niche and accessories. Position and size of any niche, grab rail or seat.
  • Finish. Tiles matching the room, a contrasting feature wall, or a seamless coating.
  • Whole room or shower only. Whether the rest of the bathroom is renovated at the same time.

Concealed valve bodies, niches and grab-rail backing must be decided now, because they are built into the wall before it is closed.

Step 3: is there paperwork with the town hall or the community?

In Andalusia, the regional planning law (Ley 7/2021, known as LISTA) allows many minor works that do not need an architect’s project to be carried out under a declaración responsable, a sworn notice that the owner files with the ayuntamiento before starting, instead of a full licence. Each town hall publishes its own forms and may ask for a description and a budget of the works.

Whether your specific conversion is covered, and what the town hall asks for, has to be checked with the municipality (to be verified for each town). Separately, Spain’s Horizontal Property Act requires owners in a building to notify the community’s representative before works in their unit. The filing and the notification are the owner’s responsibility; we tell you what the job involves so you can describe it accurately.

Step 4: what happens during strip-out?

Water to the bathroom is isolated. The bath is disconnected and removed, then the tiles and render behind it and, if the floor is to be redone, the floor tiles and part of the screed. Debris is bagged and taken out along the route agreed with the community. At this point the old waste and supply pipes are exposed and we can confirm their condition.

Occasionally something unexpected appears, such as a corroded pipe or an old cistern made of asbestos cement. Anything unexpected is shown to you with photos before we proceed. Asbestos removal is a job for a registered specialist; see retiradauralitamalaga.eu.

Step 5: how are the waste and supply rebuilt?

The new waste runs from the shower drain to the soil stack with a continuous fall. Supply pipes are rerouted to the new mixer position, and the concealed valve body, if there is one, is fixed at its final depth so it matches the finished wall. Our authorised partner installers move or add electrical points according to the zones that ITC-BT-27 of Spain’s low-voltage electrical regulation sets around a shower.

Before anything is covered, the new pipework is pressure-tested. This is also the moment to confirm the final height of the mixer and the position of the niche, because both are fixed into the wall from here on.

Step 6: how is the shower floor formed and waterproofed?

For a floor-level shower, the screed is laid with a fall towards the drain. For a tray, the base is levelled to support it fully. The walls are rendered or boarded flat. Then the membrane goes on the floor and walls of the shower area, with reinforced corners, a sealed flange at the drain and sleeves around each pipe. The waterproofing guide describes this stage in detail.

Step 7: tiling or seamless finish, then fitting

Once the membrane has been checked, the finish goes on: tiles set out to align with the niche and the rest of the room, or several coats of a seamless system. Grout and movement joints follow. Then the shower set, screen, any grab rails and accessories are fitted, and the bathroom is cleaned.

Each finish needs its own curing time before water is allowed on it, and the screen is fixed only once the surfaces have set. The silicone at the junctions also needs to cure before the first shower. This is the stage where owners are most tempted to rush, and where patience matters most: a shower used too early can crack fresh grout or lift a seal that has not bonded yet. We tell you when the room is ready and leave written care notes for the finish you chose.

Step 8: what should you check at handover?

  • Run the shower for a few minutes: water should drain without pooling and stay inside the screen.
  • Look at the floor outside the shower: it should be dry.
  • Check that the mixer is at a comfortable height and the temperature control works.
  • Ask for the care instructions for the finish, the screen and the silicone.

If you are still deciding between options, see bath-to-shower conversions, walk-in showers and bath or shower.

Official sources

Author / technical lead

Bauman Raymond Attila · Reforma Baños Málaga · Avenida Antonio Belón 3, Marbella. Last reviewed: 05/11/2026.

FAQ

Frequently asked questions

What is the first thing to check?

The depth available below the floor for the shower waste, which decides whether a flush floor is possible.

Can I choose the shower set after the walls are tiled?

Not if it has a concealed valve. That has to be fixed before tiling.

Do I need a declaración responsable?

Many minor works in Andalusia use one, but it depends on the scope and the town hall. Check with your ayuntamiento.

Who files the paperwork?

The owner. We describe the works so you or your administrator can do it accurately.

Do I need to tell my neighbours?

The Horizontal Property Act requires you to notify the community’s representative before works in your unit.

Are the new pipes tested?

Yes, before they are covered.

Can a grab rail be added later?

It is much easier if solid backing is planned before tiling.

Will the electrics need changing?

Often, because zones around a shower differ from those around a bath. Our partner installers handle it.

What if asbestos is found?

Work on that element stops and a registered specialist must remove it.

How do I know the shower is working properly?

Water should drain without pooling and the floor outside should stay dry when the shower runs.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?